24031 The Salvation Army Men's Shelter (CDBG-CV Grant 20-301011)
The Work is defined by the Contract Documents and generally consists of the phased removal of existing sitework, the removal of two single story structures, temporary utilities, new site utility work, coordination with utility companies, earthwork, phased new site development, the construction of a new Men’s Shelter, and selective renovations to a portion of the existing adjacent Warehouse on the Salvation Army campus.
Addendum No. 1
(click to expand/collapse)

Name | Size | ||
24031 009111 ADD-01 | 90.1 KB | ||
24031 009111 ADD-01_DRAWING ATTACHMENTS | 1.2 MB |
Addendum No. 2
(click to expand/collapse)

Name | Size | ||
24031 009112 ADD2 | 100.2 KB | ||
24031 Drawing Attachments ADD2 | 21.6 MB | ||
24031 Project Manual Specification Attachments ADD2 | 2.4 MB |
Addendum No. 3
(click to expand/collapse)

Name | Size | ||
24031 009113 ADD3 | 85.2 KB | ||
24031 Drawings ADD3 | 8.2 MB | ||
24031 Specifications ADD3 | 120.4 KB |
Addendum No. 4
(click to expand/collapse)

Name | Size | ||
24031 009114 ADD4 | 76.5 KB | ||
24031 Drawings ADD4 | 245.1 KB |
Addendum No. 5
(click to expand/collapse)

Name | Size | ||
24031 009115 ADD5 | 83.6 KB | ||
24031 Drawing Attachments ADD5 | 10.1 MB | ||
24031 Specification Attachments ADD5 | 222.3 KB |