FONDULAC DISTRICT LIBRARY UPGRADE BOILER SYSTEM
This project involves the complete removal of the two existing natural gas condensing boilers and the installation of four (4) new high-efficiency Navien condensing boilers to improve system reliability and efficiency. This is a two-part demolition approach, with Boiler-1 coming out first, then install (4) new boilers in Boiler-1’s place while Boiler -2 stays in operation. Remove Boiler-2 after the new system is fully operational.
Plan Holders
| Date | Company | Contact |
| 11/4/25 10:36 am |
Ac Environmental, Inc
Po Box 27`
Wilsonville, IL 62093 |
Dustin Calcari
President
Tel: 217-710-5186
Fax: 775-416-2089
|
| 10/29/25 9:12 am |
ENTEC
4300 Entec Dr
Peoria, IL 61607 |
Dan Hawk
Project Development Manager
Tel: 2174152798
Fax: 217-415-2798
|
| 11/3/25 8:06 am |
Illinois Piping Corporation
2323 SW Washington St.
Peoria, IL 61602 |
Jack Brachbill
Project Manager
Tel: 309-674-6700
Fax: 309-674-6700
|
| 11/3/25 6:25 am |
Pwxpress
1900 Coffeeport Rd
Jacksonville, FL 32208 |
Mary Miller
Tel: 4086768941
Fax: 4086768941
|
| 10/29/25 9:13 am |
The Wassi Group
208 S 1st Ave
Morton, IL 61550 |
Printshop Manager
Printshop Manager
Tel: 3092666545
|
