325-209 DUNLAP HS/HICKORY GROVE ES -ROOFTOP UNITS & BOILER REPLACEMENTS
The Scope of work for the Base Bid project consists of the following scope of work items: 1. Bid Package #1 – Dunlap High School – Rooftop Units and Boiler Replacements a. Boiler Replacement – Replace existing hot water boiler, associated pump, and hot water piping. b. Rooftop Unit Replacements – Replace two (2) existing rooftop units with like. 2. Bid Package #2 – Hickory Grove Elementary School - Boiler Replacement a. Boiler Replacement – Replace existing hot water boiler and hot water piping. Revise boiler piping for all boilers from variable primary to primary secondary. Provide primary pumps for existing boilers.
Status
Accepting Bids
| Prebid Date | 12/9/25 2:00pm |
| Bid Date | 12/18/25 2:00pm |
Location
400 S. Fourth St. Dunlap, IL 61525