The Scope of work for the Base Bid project consists of the following scope of work items: 1. Bid Package #1 – Dunlap High School – Rooftop Units and Boiler Replacements a. Boiler Replacement – Replace existing hot water boiler, associated pump, and hot water piping. b. Rooftop Unit Replacements – Replace two (2) existing rooftop units with like. 2. Bid Package #2 – Hickory Grove Elementary School - Boiler Replacement a. Boiler Replacement – Replace existing hot water boiler and hot water piping. Revise boiler piping for all boilers from variable primary to primary secondary. Provide primary pumps for existing boilers.