325-209 DUNLAP HS/HICKORY GROVE ES -ROOFTOP UNITS & BOILER REPLACEMENTS

The Scope of work for the Base Bid project consists of the following scope of work items: 1. Bid Package #1 – Dunlap High School – Rooftop Units and Boiler Replacements a. Boiler Replacement – Replace existing hot water boiler, associated pump, and hot water piping. b. Rooftop Unit Replacements – Replace two (2) existing rooftop units with like. 2. Bid Package #2 – Hickory Grove Elementary School - Boiler Replacement a. Boiler Replacement – Replace existing hot water boiler and hot water piping. Revise boiler piping for all boilers from variable primary to primary secondary. Provide primary pumps for existing boilers.
Bid Package #1 - Dunlap High School (click to expand/collapse)
Order this section for $0.00
This is available for download to registered users. Log in now
Name Size
325-209 Dunlap High School - Rooftop Units and Boiler Replacements - Project Manual 3.2 MB
325-209 Dunlap Schools - Rooftop Units and Boiler Replacements - Bidding Manual 3.5 MB
Bid Package #2 - Hickory Grove Elementary School (click to expand/collapse)
Order this section for $0.00
This is available for download to registered users. Log in now
Name Size
325-209 Dunlap Schools - Hickory Grove Boiler Replacement - Project Manual 2.8 MB
325-209 Dunlap Schools - Rooftop Units and Boiler Replacements - Bidding Manual 3.5 MB