325-209 DUNLAP HS/HICKORY GROVE ES -ROOFTOP UNITS & BOILER REPLACEMENTS

The Scope of work for the Base Bid project consists of the following scope of work items: 1. Bid Package #1 – Dunlap High School – Rooftop Units and Boiler Replacements a. Boiler Replacement – Replace existing hot water boiler, associated pump, and hot water piping. b. Rooftop Unit Replacements – Replace two (2) existing rooftop units with like. 2. Bid Package #2 – Hickory Grove Elementary School - Boiler Replacement a. Boiler Replacement – Replace existing hot water boiler and hot water piping. Revise boiler piping for all boilers from variable primary to primary secondary. Provide primary pumps for existing boilers.

Status

Accepting Bids

Prebid Date 12/9/25 2:00pm
Bid Date 12/18/25 2:00pm

Company & Contacts

KEDBluestone
Adam Camp  
309-431-3712

Location

400 S. Fourth St. Dunlap, IL 61525