325-209 DUNLAP HS/HICKORY GROVE ES -ROOFTOP UNITS & BOILER REPLACEMENTS

The Scope of work for the Base Bid project consists of the following scope of work items: 1. Bid Package #1 – Dunlap High School – Rooftop Units and Boiler Replacements a. Boiler Replacement – Replace existing hot water boiler, associated pump, and hot water piping. b. Rooftop Unit Replacements – Replace two (2) existing rooftop units with like. 2. Bid Package #2 – Hickory Grove Elementary School - Boiler Replacement a. Boiler Replacement – Replace existing hot water boiler and hot water piping. Revise boiler piping for all boilers from variable primary to primary secondary. Provide primary pumps for existing boilers.
Date Company Contact
1764762085
12/3/25 11:41 am
Greater Peoria Contractors and Suppliers Association
1811 W Altorfer Ave
Peoria, IL 61615
Anna Taylor
Plan Room
Tel: 3096922501
Fax: (309) 692-5710
1764842913
12/4/25 10:08 am
Illinois Piping Corporation
2323 SW Washington St.
Peoria, IL 61602
Brent Lewis
President
Tel: 3096746700
Fax: 3096749071
1764773801
12/3/25 8:56 am
KEDBluestone
Adam Camp
1764773862
12/3/25 8:57 am
KEDBluestone
Kyle Sievers
1764773961
12/3/25 8:59 am
KEDBluestone
Ian Keith
1764772613
12/3/25 2:36 pm
Mechanical Service of Galesburg, Inc
1144 Monmouth Blvd
Galesburg, IL 61468
Becky Hale
Asst Project Manager
Tel: 309-342-8136
Fax: 309-342-4195
1764773889
12/3/25 8:58 am
The Wassi Group
208 S 1st Ave
Morton, IL 61550
Eric Bergstresser
President // Owner
1764773906
12/3/25 8:58 am
The Wassi Group
208 S 1st Ave
Morton, IL 61550
Printshop Manager
Printshop Manager
Tel: 3092666545