325-209 DUNLAP HS/HICKORY GROVE ES -ROOFTOP UNITS & BOILER REPLACEMENTS
The Scope of work for the Base Bid project consists of the following scope of work items: 1. Bid Package #1 – Dunlap High School – Rooftop Units and Boiler Replacements a. Boiler Replacement – Replace existing hot water boiler, associated pump, and hot water piping. b. Rooftop Unit Replacements – Replace two (2) existing rooftop units with like. 2. Bid Package #2 – Hickory Grove Elementary School - Boiler Replacement a. Boiler Replacement – Replace existing hot water boiler and hot water piping. Revise boiler piping for all boilers from variable primary to primary secondary. Provide primary pumps for existing boilers.
Plan Holders
| Date | Company | Contact |
| 12/3/25 11:41 am |
Greater Peoria Contractors and Suppliers Association
1811 W Altorfer Ave
Peoria, IL 61615 |
Anna Taylor
Plan Room
Tel: 3096922501
Fax: (309) 692-5710
|
| 12/4/25 10:08 am |
Illinois Piping Corporation
2323 SW Washington St.
Peoria, IL 61602 |
Brent Lewis
President
Tel: 3096746700
Fax: 3096749071
|
| 12/3/25 8:56 am | KEDBluestone |
Adam Camp
|
| 12/3/25 8:57 am | KEDBluestone |
Kyle Sievers
|
| 12/3/25 8:59 am | KEDBluestone |
Ian Keith
|
| 12/3/25 2:36 pm |
Mechanical Service of Galesburg, Inc
1144 Monmouth Blvd
Galesburg, IL 61468 |
Becky Hale
Asst Project Manager
Tel: 309-342-8136
Fax: 309-342-4195
|
| 12/3/25 8:58 am |
The Wassi Group
208 S 1st Ave
Morton, IL 61550 |
Eric Bergstresser
President // Owner
|
| 12/3/25 8:58 am |
The Wassi Group
208 S 1st Ave
Morton, IL 61550 |
Printshop Manager
Printshop Manager
Tel: 3092666545
|