24024 Morton CUSD 709 Weight Training Facility and Performing Arts Expansion
The scope of the Project is defined by the Contract Documents and generally consists of a 1 and 2-story building addition of a Weight Training Facility and Performing Arts Expansion with the selected demolition of an existing structure and renovation and expansion of an existing lobby. The building addition is a steel-framed super structure with drilled pier foundations. The exterior façade is an aluminum composite metal panel façade over metal stud sub-framing and CMU backup with aluminum curtain wall and entry systems. The roof is a single ply EPDM membrane roof. Interior finishes consist of CMU walls, drywall partitions, LVT flooring, rubber flooring, and polished concrete slabs.
Addendum No. 2
(click to expand/collapse)

Name | Size | ||
24024 009102 AD2 | 1.2 MB |
Addendum No. 3
(click to expand/collapse)

Name | Size | ||
24024 009103 AD3 | 16.2 MB |
Addendum No. 4
(click to expand/collapse)

Name | Size | ||
24024 009104 AD4 | 7.5 MB |
Addendum No. 5
(click to expand/collapse)

Name | Size | ||
24024 009105 AD5 | 9.2 MB |
Addendum No. 6
(click to expand/collapse)

Name | Size | ||
24024 009106 AD6 | 1.1 MB |
Updated Addendum No. 1
(click to expand/collapse)

Name | Size | ||
24024 009101 AD1 | 1.3 MB |