24024 Morton CUSD 709 Weight Training Facility and Performing Arts Expansion

The scope of the Project is defined by the Contract Documents and generally consists of a 1 and 2-story building addition of a Weight Training Facility and Performing Arts Expansion with the selected demolition of an existing structure and renovation and expansion of an existing lobby. The building addition is a steel-framed super structure with drilled pier foundations. The exterior façade is an aluminum composite metal panel façade over metal stud sub-framing and CMU backup with aluminum curtain wall and entry systems. The roof is a single ply EPDM membrane roof. Interior finishes consist of CMU walls, drywall partitions, LVT flooring, rubber flooring, and polished concrete slabs.
Project Manual (click to expand/collapse)
Order this section for $0.00
This is available for download to registered users. Log in now
Name Size
24024 WT&PA EXPANSION_Bid PM V1_20250811 11.0 MB
24024 WT&PA EXPANSION_Bid PM V2_20250811 6.9 MB