24024 Morton CUSD 709 Weight Training Facility and Performing Arts Expansion

The scope of the Project is defined by the Contract Documents and generally consists of a 1 and 2-story building addition of a Weight Training Facility and Performing Arts Expansion with the selected demolition of an existing structure and renovation and expansion of an existing lobby. The building addition is a steel-framed super structure with drilled pier foundations. The exterior façade is an aluminum composite metal panel façade over metal stud sub-framing and CMU backup with aluminum curtain wall and entry systems. The roof is a single ply EPDM membrane roof. Interior finishes consist of CMU walls, drywall partitions, LVT flooring, rubber flooring, and polished concrete slabs.

Status

Bidding Closed

Prebid Date 8/13/25 2:00pm
Bid Date 8/27/25 2:00pm

Company & Contacts

Keach Architectural Design
Lee Gerriets  
3092634545

Location

350 N. Illinois Avenue Morton, Illinois 61550